fbpx
Skip to content

Equip your community with free charging stations

Act now to comply with the requirements of the LOM law, free of charge, with a recharge solution. simple, reliable and turnkey.

1

Free

We cover all installation and operating costs.

Reliability assured

Our remuneration depends on the smooth operation of the charging stations

LOM* law compliance

1 parking space in 20 should be equipped with a recharging point by 2025.

A simple e-mail is all it takes to quickly obtain your IRVE master plan.

Would you prefer to call us directly? We look forward to hearing from you
on +33 9 75 89 15 01

Steps to obtain charging stations

Logo numéro 1

After discussing with you the various possibilities for the installation of bollards, we are presenting you with an Expression of Interest which will lead to the issue of an Authorization for Temporary Occupation of the territory (AOT). This legal framework is perfectly suited to the issues at stake for the various parties involved, and is not affected by all the rigidity of public procurement.

Logo numéro 2

Legal notice                                                                                                                                                                                                            Certain authorizations for the use of public space require legal publication, which means that the local authority must publish its plan to award the occupation of the public domain to an investor operator.

Logo numéro 3

Signature AOT The local authority and Electric 55 Charging draw up a contract based on the terms of the partnership.

Logo numéro 4

Deployment Once the AOT has been signed, Electric 55 Charging starts work according to a pre-defined schedule.

For more information, please make an appointment via the calendar below.